OUR METHOD

Where our cost estimates come from.

Clear starting figures, honest limitations, and a better way to compare remodeling decisions.

THE PROCESS

What goes into a planning estimate

Every project has its own decisions. Here's how the current Kitchen Calculator develops your starting range.

01

Define the work

You choose the kitchen's approximate floor area, what you plan to replace, whether the layout changes, and your preferred finish level.

02

Use published cost research

Basic uses your dropdown choices and suggested quantities. Its wider planning range allows for uncertainty in those quantities and in installed prices. Advanced lets you enter measurements and prices for a more specific estimate. Both modes price the same work using the same item-by-item calculation.

03

Show a range, not a promise

Basic builds a planning range about 20% below and above the working subtotal. Advanced uses the middle half of the largest remaining guide-price range and includes the full ranges from any quotes you enter. The Advanced result also shows the full guide-price spread.

WHAT AFFECTS YOUR PRICE

Why your actual quote can differ.

A national planning range cannot see inside your walls or compare local installers. These factors can materially change the final price:

  • Kitchen size and the exact work included
  • Cabinet, countertop, flooring and appliance specifications
  • Moving plumbing, electrical connections or structural elements
  • Demolition, disposal, preparation and unexpected repairs
  • Local contractor labor, building access and permit requirements
LOCATION MATTERS

How your state affects installation costs

Choose a state to apply a wage comparison to supported installation lines. The model uses May 2025 BLS median trade wages and adjusts only the published labor portion. Entered prices, materials and items without a labor split stay as supplied. A ZIP code alone uses national guide rates.

Different numbers mean different things

Homeowner survey medians, national remodeling ranges and individual installed-item prices describe different scopes. We keep them separate rather than adding them together or presenting them as the same kind of estimate.

The selected line items make up your subtotal. Whole-kitchen cost-guide bands and Houzz survey medians are context only and are never added to it.

READ THE SOURCES

Our published references

Our installed-unit planning ranges use relevant HomeGuide cabinet, surface, appliance and trade-cost guides, linked next to each result. For whole-project context, see the HomeGuide kitchen remodeling cost guide. For spending context, we reference the 2026 Houzz U.S. Kitchen Trends Study. A cost guide's broad ranges and a survey's reported spending median are not interchangeable.

We do not inspect your property or certify any contractor quote. Before starting a project, obtain written local bids that specify materials, labor, exclusions, timing and permit responsibilities.

Start my estimate
COMMON QUESTIONS

Questions about our estimates

Are these costs based on actual contractor bids?

The current national ranges come from published cost guides, not a validated sample of project-specific bids at your address. Always request comparable written quotations from local qualified contractors.

Does the total include labor?

Standard installation is included in each selected installed-unit rate. We do not add a second general labor charge. Permits, unusual preparation and other excluded work need separate quotes.

Why is the estimate a range rather than one number?

A kitchen project’s scope, finish, building conditions, utility changes and local trades can differ. A single precise figure would imply more information than this national model has.

Is the midpoint the most likely cost?

No. The midpoint is the arithmetic center of the selected low and high guide values. It is not the median from a homeowner survey or a prediction of a contractor invoice.

Are state or ZIP code multipliers used?

State selection adjusts the documented installation portion for supported trades using BLS wage ratios. ZIP-only estimates use national guide prices. Materials and prices you enter are unchanged by location.